incredible-benevolence
Deploy and Host incredible-benevolence with Railway
Bun Function
railwayapp/function-bun:1.2.16
Just deployed
hello-world
hello-world
Just deployed
Deploy and Host
- Deploy: Assemble the layout on a stable 4x8 ft table or workbench in a dedicated hobby space.
- Host: Display the completed layout at home, local clubs, or model train exhibitions with proper lighting and space for viewers.
About Hosting
- Hosting involves setting up the layout for personal enjoyment or public viewing, ensuring all tracks are functional and scenery is intact. It may require a temporary setup with portable tables or a permanent installation in a basement or garage, depending on space availability.
Why Deploy
- Deploying the layout allows hobbyists to bring their design to life, test train operations, and share their work with others. It provides a hands-on learning experience and a satisfying creative outlet.
Common Use Cases
- Hobbyist Practice: Perfect for beginners to master track laying and scenery techniques.
- Community Events: Suitable for showcasing at train shows or club meetings.
- Educational Demonstrations: Used in workshops to teach model railroading skills.
Dependencies for
Deployment Dependencies
- Materials: Insulation board, HO scale track (20 ft flex track, 4 turnouts), kits (freight depot, factory, town buildings), scenery supplies (foam, plaster cloth, ground cover, static grass, resin water).
- Tools: Hot glue gun, hobby knife, paintbrushes, soldering iron, multimeter.
- Skills: Basic modeling and wiring knowledge; optional advanced skills for DCC setup.
- Space: Minimum 4x8 ft flat area, plus storage for materials.
- Time: 20–30 hours for assembly and testing.
Template Content
Bun Function
ghcr.io/railwayapp/function-bun:1.2.16hello-world
hello-world